FIELD: construction. SUBSTANCE: method includes formation of slot round protected structure with man-holes filling of slot with draining material, and arrangement in slot of water draining member. Cementing mortar is introduced into slot before filling it with draining material. Before arrangement of water draining member layer of draining material is placed, levelled and compacted. Slot is filled with draining material after arrangement of water draining member. Before filling of slot with draining material, solvent of cementing material is introduced. Cementing material is used in form of 10% aqueous solution of starch, and used as solvent is solution of amylosubtilin in the amount of 0.02% of starch dry mass. EFFECT: higher efficiency. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CONSTRUCTING A DRAINAGE CURTAIN | 0 |
|
SU1474220A1 |
GROUND FREEZING DEVICE | 1997 |
|
RU2117096C1 |
DRAINAGE CURTAIN CONSTRUCTION METHOD | 0 |
|
SU1288267A1 |
METHOD FOR ERECTION OF PILES IN PERMAFROST GROUND | 1997 |
|
RU2117107C1 |
METHOD OF MEASURING SEEPAGE COEFFICIENT OF LOW-PERMEABILITY SEPARABLE SOIL | 0 |
|
SU1408309A1 |
METHOD FOR IDENTIFYING GEODYNAMIC MOVEMENTS IN GROUND AND FOR PROTECTING SURFACE METAL STRUCTURES FROM THEM | 1999 |
|
RU2165498C1 |
INSPECTION HOLE OF EVACUATED DRAINAGE SYSTEM | 0 |
|
SU1033631A1 |
METHOD OF CONSTRUCTING ARTIFICIAL FOUNDATION | 0 |
|
SU1469026A1 |
SECTIONAL PRECAST PILE | 1991 |
|
RU2016963C1 |
DEVICE FOR PROTECTING SURFACE-LAID PIPELINE FROM GEODYNAMIC MOVEMENTS IN GROUND | 1999 |
|
RU2166026C1 |
Authors
Dates
1994-10-15—Published
1991-11-20—Filed