FIELD: construction engineering. SUBSTANCE: according to method, bore-hole is driven, then installed in bore-hole is pile body together with component made of expanding material. Aforesaid component is slipped on pile body. Component made of expanding material is in the form of tube having longitudinal passages. After this component is installed as required, delivered into its passages under pressure is steam and in result component is expanded and pile is fixed in bore-hole. EFFECT: higher efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
PILE | 1999 |
|
RU2166027C1 |
SECTIONAL PRECAST PILE | 1991 |
|
RU2016962C1 |
SECTIONAL PRECAST PILE | 1991 |
|
RU2016963C1 |
METHOD OF CONSTRUCTING CAST-IN-PLACE PILE | 0 |
|
SU1368387A1 |
METHOD FOR ERECTION OF DRAINAGE SCREEN | 1991 |
|
RU2021426C1 |
METHOD FOR IDENTIFYING GEODYNAMIC MOVEMENTS IN GROUND AND FOR PROTECTING SURFACE METAL STRUCTURES FROM THEM | 1999 |
|
RU2165498C1 |
DEVICE FOR PROTECTING SURFACE-LAID PIPELINE FROM GEODYNAMIC MOVEMENTS IN GROUND | 1999 |
|
RU2166026C1 |
METHOD OF CONSTRUCTING FOUNDATION UNDER STRUCTURE | 0 |
|
SU1717727A1 |
METHOD OF ERECTING PILE FOUNDATION FOR HEATED BUILDING ON THAWABLE PERMAFROST SOIL | 0 |
|
SU688557A1 |
METHOD FOR INSTALLATION OF PILES INTO PERMAFROST GROUNDS | 1990 |
|
SU1828154A1 |
Authors
Dates
1998-08-10—Published
1997-03-31—Filed