FIELD: track laying. SUBSTANCE: tracks 2,3,4 arranged at little distance from each other are laid with provision of stability of gauge owing to the fact that ties are passed in pairs under tracks 2,4 and under adjoining rails 3.1 or 3.2 of middle track 3 in space between rails 3.1, 3.2 and are butt-joined so that butt joints 11 of pairs of ties 9k, 10k and 9k+1, 10k+1 following each other are arranged alternately at both sides of axis square to axles 12 of ties between rails 3.1 and 3.2 and that head parts 14 of at least three long ties 9k, 10k+1, 9k+2 following each other and driven under axles 12 are rigidly connected to each other by means of fastening device 13. EFFECT: enlarged operating capabilities. 2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
PLACEMENT AND/OR FIXATION OF ELECTRICAL LINES SECTIONS ALONG VEHICLE PATH | 2010 |
|
RU2530940C2 |
TRACK SECTION SUPPORT | 2001 |
|
RU2249642C2 |
SYSTEM AND METHOD FOR ELECTRIC POWER TRANSFER TO VEHICLE | 2009 |
|
RU2480354C2 |
MOUNTING FOR RAIL AND RAIL FIXING SYSTEM | 2005 |
|
RU2372435C2 |
METHOD FOR RESILIENT BENDING OF SWITCH BAR | 1995 |
|
RU2103435C1 |
RAIL SECURING SYSTEM | 2005 |
|
RU2340718C2 |
INDUCTIVE RECEIPT OF ELECTRIC POWER FOR TRANSPORT FACILITY | 2009 |
|
RU2498912C9 |
TRANSMISSION OF ELECTRIC POWER TO VEHICLE | 2009 |
|
RU2481968C2 |
TRANSFER BETWEEN TRACKS | 1995 |
|
RU2137870C1 |
CONNECTING STRUCTURE AND RAILWAY BRIDGE WITH SUCH CONNECTING STRUCTURE | 2014 |
|
RU2643115C2 |
Authors
Dates
1994-10-30—Published
1991-10-11—Filed