FIELD: oil recovery. SUBSTANCE: method comprises steps of settling deposit water samples, had been recovered together with oil as by product; measuring time interval from a time moment of taking the sample out of the well up to a beginning of precipitation of gypsum upon it settling, many-times repeating stages of taking off samples, measuring time interval from a time moment of taking the sample of water up to a beginning of precipitation of gypsum in it upon settling the water sample; and according to a change of the above mentioned time interval determining a termination of an inhibitor action at recovery of flooded oil. EFFECT: enhanced accuracy of controlling. 1 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR SUPPLYING INHIBITOR IN HYDROPHOBIC THERMOPLASTIC MIXTURE IN WELL AND DEVICE FOR ITS IMPLEMENTATION | 2016 |
|
RU2643230C2 |
GROUND POWER UNIT OF DEEP-WELL PUMP, MOSTLY HYDROPISTON OR JET, FOR LIFTING OF FLUID FROM WELL WITH APPLICATION OF WORKING FLUID ENERGY | 2008 |
|
RU2357099C1 |
COMPRESSOR UNIT FOR COMPRESSION OF GAS OR GAS-LIQUID MIXTURE, WHICH IS INTENDED FOR THEIR PUMPING TO WELL OR PIPELINE | 2008 |
|
RU2391557C1 |
DEVICE FOR FEEDING OF THERMOPLASTIC REACTANT INTO WELL | 2008 |
|
RU2384693C1 |
THERMOPLASTIC AGENT WELL SUPPLY METHOD AND DEVICE FOR ITS EXECUTION (VERSIONS) | 2008 |
|
RU2379478C1 |
COMPOUND FOR PREVENTING DEPOSITION OF SALTS AND SAND IN PRODUCTION OF OIL | 1997 |
|
RU2132451C1 |
SYSTEM FOR WATER INJECTION IN INJECTION WELL FOR FORMATION PRESSURE MAINTENANCE | 2004 |
|
RU2274737C1 |
METHOD OF MONITORING GYPSUM DEPOSITS WHILE PRODUCING WATER-BEARING OIL WELLS | 0 |
|
SU834333A1 |
TOOL FOR INHIBITOR SUPPLY | 2008 |
|
RU2382177C1 |
COMPOSITION FOR PREVENTION OF SALT FORMATION DURING OIL PRODUCTION | 2003 |
|
RU2259470C2 |
Authors
Dates
1994-11-15—Published
1990-11-11—Filed