FIELD: hydroelectric power engineering. SUBSTANCE: intake piping is installed on supports on river channel and has vertical downstream inlet section near bank or on bank, or partially on bank and partially in river. Inlet section has converging tube. Turbine is mounted at upstream area of inlet section. Converging tube may be mounted on river bottom or in upper layers of river. EFFECT: improved design. 3 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
RIVERSIDE HYDROELECTRIC POWER STATION | 1990 |
|
RU2023903C1 |
RIVER POWER STATION | 1991 |
|
RU2017885C1 |
HYDROELECTRIC STATION | 1991 |
|
RU2021424C1 |
HYDROELECTRIC POWER STATION | 1991 |
|
RU2023806C1 |
HYDROELECTRIC PLANT | 1991 |
|
RU2010913C1 |
RIVERSIDE HYDROELECTRIC STATION | 1991 |
|
RU2020260C1 |
HYDROELECTRIC POWER PLANT | 0 |
|
SU1824479A1 |
HYDROELECTRIC POWER PLANT | 1991 |
|
RU2012713C1 |
HYDROELECTRIC STATION | 0 |
|
SU1797635A3 |
METHOD AND APPARATUS FOR PRODUCING POWER | 1990 |
|
RU2005906C1 |
Authors
Dates
1994-11-30—Published
1991-03-20—Filed