FIELD: civil engineering. SUBSTANCE: foundation comprises slabs with shock-absorbing devices therebetween. The latter are disposed parallel to longitudinal and transverse axes of foundation and have the form of bands with one spiral coil each. Straightened end portions of bands are secured to slabs. Bands disposed parallel to transverse axis are arranged within slab contour while those disposed parallel to longitudinal axis, beyond said contour. EFFECT: improved design. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
EARTHQUAKEPROOF FOUNDATION | 1991 |
|
RU2023816C1 |
EARTHQUAKE-PROOF MULTISTORY BUILDING | 0 |
|
SU1761928A1 |
EARTHQUAKE-PROOF OIL PIPELINE | 1991 |
|
RU2015251C1 |
OIL PIPELINE | 1992 |
|
RU2029824C1 |
MULTISTORY SEISMIC BUILDING | 0 |
|
SU1775541A1 |
MANY-STORIED EARTHQUAKE-PROOF BUILDING | 1992 |
|
RU2033514C1 |
EARTHQUAKE-PROOF MULTISTORY BUILDING | 0 |
|
SU1694830A1 |
MULTISTORY EARTHQUAKE-PROOF BUILDING | 0 |
|
SU1763621A1 |
MULTISTORY QUAKE-PROOF BUILDING | 1992 |
|
RU2024716C1 |
FOUNDATION | 1991 |
|
RU2015249C1 |
Authors
Dates
1994-12-15—Published
1990-12-19—Filed