FIELD: mechanical engineering. SUBSTANCE: hole is partially filled with insert on side opposite to the force being applied. Circular projection is formed by pressing-out on side of the step at the diameter equal to diameter of the step forming simultaneously the strengthened layer and blind chamber above the end of the insert. Then applying the axial compression force to the end of the circular projection, chamber is filled forming the bearing surface of the step, after which insert is removed and axial force is applied to the bearing surface of the step. EFFECT: enhanced efficiency. 7 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PRODUCTION OF RIVETS | 1992 |
|
RU2006334C1 |
METHOD OF RIVETING COMBINED PACKS | 1992 |
|
RU2007252C1 |
SPOT WELDING METHOD | 1992 |
|
RU2049626C1 |
CYLINDRICAL SURFACE FORMING METHOD | 1992 |
|
RU2047411C1 |
RIVETING METHOD | 1992 |
|
RU2074046C1 |
METHOD OF RIVETING COMPOSITE STACKS | 1991 |
|
RU2007250C1 |
METHOD OF RIVETING | 1994 |
|
RU2069118C1 |
METHOD OF MAKING HOLES | 1992 |
|
RU2043810C1 |
METHOD OF MAKING FLUSH JOINT | 1991 |
|
RU2007249C1 |
METHOD FOR SECURING TUBES TO TUBE PLATES | 1998 |
|
RU2162021C2 |
Authors
Dates
1994-12-30—Published
1992-02-03—Filed