FIELD: mining industry. SUBSTANCE: section of timbering the cleansing powered mining complex has a roof and a pedestal made with dowels and hinged between themselves with stands and with a hydraulic jack of progression. One of the jack ends is hinged on one of the supporting members, another end is hinged with another supporting member through an extensible fencing hinged with the roof and the pedestal. Still another end of the hydraulic jack of progression is attached to the extreme link of the fencing removed from another supporting member at a certain distance from the hinge connecting the stated extreme link with the supporting member. EFFECT: improved powered timberwork of the breakage stope. 7 dwg
Title | Year | Author | Number |
---|---|---|---|
SECTION OF MECHANIZED TIMBERING | 1992 |
|
RU2065060C1 |
SECTION OF MECHANIZED TIMBERING | 1992 |
|
RU2065059C1 |
POWERED ROOF SUPPORT | 0 |
|
SU1765448A1 |
UNIT OF UNYIELDING BALLOON SUPPORT | 1991 |
|
RU2029095C1 |
METHOD OF CONTROL OF SUPPORT IN PLANE OF BED AND DEVICE FOR ITS EMBODIMENT | 1994 |
|
RU2090756C1 |
POWERED SUPPORT UNIT | 0 |
|
SU1668687A1 |
POWERED ROOF SUPPORT | 0 |
|
SU1765443A1 |
POWER ROOF SUPPORT | 0 |
|
SU1073475A2 |
LONGWALL SET OF EQUIPMENT | 0 |
|
SU1796031A3 |
UNIT FOR MINING THICK COAL SEAMS | 0 |
|
SU1273591A1 |
Authors
Dates
1995-01-20—Published
1991-05-07—Filed