FIELD: hydraulic engineering. SUBSTANCE: method involves filling an embankment in conjunction with railway transport by an excavator moving through drain ditch dug in advance in embankment footing and filled with crushed rock to the excavator level. EFFECT: higher efficiency. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF RAISING EMBANKMENT FROM LOCAL ACCESSIBLE MATERIAL | 0 |
|
SU1710658A1 |
METHOD OF ERECTING DAMS OF LOCALLY AVAILABLE MATERIALS | 0 |
|
SU821643A1 |
LOCAL MATERIAL DAM | 1990 |
|
RU2007510C1 |
WASHED-UP HYDRAULIC STRUCTURE | 1991 |
|
RU2039151C1 |
LOCAL MATERIAL DIKE | 0 |
|
SU1618822A1 |
DAM OF LOCAL MATERIALS | 0 |
|
SU1416600A1 |
HYDRAULIC STRUCTURE BUILT BY HYDRAULIC FILLING | 0 |
|
SU1772312A1 |
METHOD OF CONSTRUCTING DAMS FROM LOCAL MATERIALS | 0 |
|
SU1472564A1 |
METHOD TO BUILD EARTH WATER-RETAINING CONSTRUCTION IN WARM SEASON (VERSIONS) | 2009 |
|
RU2426832C1 |
METHOD FOR PROTECTING TERRITORY FROM FLOODING | 2000 |
|
RU2176700C1 |
Authors
Dates
1995-03-27—Published
1991-06-19—Filed