FIELD: boiler plants. SUBSTANCE: boiler plant is additionally provided with starting boiler equipped with heater hydraulically connected with lower part of electrode boiler and water supply branch pipe which make it possible to supply boiling water to electrode boiler. EFFECT: enhanced reliability. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
BOILER PLANT | 1992 |
|
RU2037089C1 |
BOILER PLANT | 1996 |
|
RU2117858C1 |
BOILER PLANT | 1996 |
|
RU2117859C1 |
THREE-PHASE ELECTRIC WATER HEATER | 1992 |
|
RU2037088C1 |
BOILER UNIT | 0 |
|
SU981750A1 |
BOILER AGGREGATE | 2000 |
|
RU2195606C2 |
BOILER | 0 |
|
SU1744365A2 |
HEATING PLANT | 1999 |
|
RU2155914C1 |
SELF-CONTAINED BOILER PLANT FOR STEAM HEATING SYSTEMS | 1992 |
|
RU2045699C1 |
HIGH-FREQUENCY OZONATION PLANT | 1995 |
|
RU2092431C1 |
Authors
Dates
1995-05-27—Published
1991-12-24—Filed