FIELD: heat power engineering. SUBSTANCE: upper boiler drum-separator is connected to two lower headers through side tubular screens 2 and rows of tubes. Spacers 5 are located between the tubes of side screens 2 and connected to them through a gas-proof joint. The rows of tubes are separated into separate banks 6 spaced with formation of openings 7 between them. In the rows of each bank 6 facing openings 7 at least two tubes on the side of screen 2 are connected to each other and to the tube of the latter through spacer members 8 made in the form of bars located in parallel rows. EFFECT: improved design. 3 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
WASTE-HEAT BOILER | 1992 |
|
RU2051311C1 |
VERTICAL TWO-DRUM BOILER | 2001 |
|
RU2219434C2 |
VERTICAL DOUBLE-DRUM BOILER | 1994 |
|
RU2096679C1 |
BOILER | 1992 |
|
RU2037091C1 |
BOILER HEATING SURFACE | 1992 |
|
RU2044951C1 |
BOILER | 1996 |
|
RU2122678C1 |
BOILER | 1993 |
|
RU2076996C1 |
COMBINATION BOILER | 1992 |
|
RU2037093C1 |
BOILER | 2000 |
|
RU2193729C2 |
BOILER | 1993 |
|
RU2047041C1 |
Authors
Dates
1995-06-09—Published
1992-04-20—Filed