FIELD: mold for forming prestressed ferroconcrete products. SUBSTANCE: mold has pallet 1, sectioned side shields 2, end shields 8, screw couplings 9, two cross-pieces secured on fitting rod ends. Cross-pieces are interconnected through flexible tie running around two drums. Drums are mounted in such a way that tie portion between cross-piece and point of contact with drum is disposed in alignment with direction of force created in fittings. EFFECT: increased efficiency, wider operational capabilities and enhanced reliability in operation. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
MOULD FOR MAKING PRESTRAINED FERROCONCRETE ARTICLES | 0 |
|
SU1328208A1 |
METHOD FOR ERECTION AND RECONSTRUCTION OF BUILDINGS AND PRODUCTION OF ARTICLES FROM COMPOSITE MATERIALS MAINLY OF CONCRETE FOR ABOVE PURPOSES | 1996 |
|
RU2107783C1 |
METHOD FOR ERECTION AND RECONSTRUCTION OF BUILDINGS AND PRODUCTION OF ARTICLES FROM COMPOSITE MATERIALS MAINLY CONCRETE FOR ABOVE PURPOSES | 1996 |
|
RU2107784C1 |
FORM FOR PRODUCING PRESTRESSED BUILDING PRODUCTS | 0 |
|
SU937153A1 |
METHOD AND APPARATUS FOR MANUFACTURING PRESTRESSED FERROCONCRETE ARTICLES | 0 |
|
SU1548389A1 |
PLANT FOR MANUFACTURING FERRO-CONCRETE BOX BLOCKS | 0 |
|
SU876439A2 |
REENFORCING CAGE FOR INDIRECT REINFORCEMENT | 0 |
|
SU1787190A3 |
METHOD FOR CYCLIC MOVEMENT OF SOLID REINFORCED CONCRETE BRIDGE SPAN IN LONGITUDINAL DIRECTION | 2004 |
|
RU2242559C1 |
CONSTRUCTION METHOD FOR BRIDGE OR OVERPASS | 2002 |
|
RU2251604C2 |
LARGE-BLOCK BUILDING AND METHOD TO MANUFACTURE ITEMS FOR ITS ERECTION | 2012 |
|
RU2498024C1 |
Authors
Dates
1995-06-19—Published
1992-11-05—Filed