FIELD: foundry engineering. SUBSTANCE: when air-heater starts filling up signal for forced opening of release valve appears. After release valve tongue gets out of idling motion, signal calls for valve opening cessation. Simultaneously another signal calls for short time increase of blow discharge by means of acceleration of air-blowing unit and switching over pressure regulator for control of release valve position. It increases safety of working system and blow pressure accuracy. EFFECT: enhanced efficiency. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
APPARATUS FOR COMPENSATING BLASTING LOSS IN THE PROCESS OF FILLING BLAST FURNACE AIR HEATERS | 1991 |
|
RU2068447C1 |
METHOD OF COMPENSATION BLAST LOSSES IN FILLING OF AIR- HEATING BLAST FURNACE | 1991 |
|
RU2040547C1 |
METHOD OF REGULATING BLAST MODE OF BLAST FURNACE | 1990 |
|
SU1777662A3 |
METHOD AND APPARATUS TO BLOW-OUT BLAST-FURNACE DURING BLAST-ENGINE EMERGENCY SHUT-DOWN | 1992 |
|
RU2034032C1 |
BLAST FURNACE SMELTING METHOD | 1991 |
|
RU2006502C1 |
METHOD TO COMPENSATE LOSSES OF BLASTING DURING FILLING OF BLAST FURNACES AIRHEATERS BLOCK | 1991 |
|
RU2063444C1 |
METHOD OF STOPPING BLAST FURNACE WITH GAS IGNITION ON MOUTH AND SUBSEAUENT BLOW-IN | 0 |
|
SU1774953A3 |
METHOD OF CHARGING BLOWING-IN BURDEN AT BLAST FURNACE BLOWING-DOWN | 0 |
|
SU1804486A3 |
BELT CONVEYER STOP | 0 |
|
SU1265115A1 |
SYSTEM OF AUTOMATIC REGULATION OF PRESSURE OF BLAST-FURNACE GAS | 1997 |
|
RU2106411C1 |
Authors
Dates
1995-06-27—Published
1992-03-02—Filed