FIELD: hydropower engineering. SUBSTANCE: method involves regulating cascade runoff of dam power stations during duty fall hours in power system by filling runoff control vessels upon automatic stabilization of water level difference at each power station except for final power station downstream of water current. EFFECT: increased efficiency in generating electric energy. 2 dwg
Authors
Dates
1995-07-09—Published
1991-03-12—Filed