FIELD: blast operations. SUBSTANCE: this process includes positioning of intermediate detonator with detonating cord in borehole and loading of absorber from combustible material into borehole. After loading of absorber borehole is filled with liquid nitrogen and cured up to evaporation of nitrogen. After evaporation of liquid nitrogen borehole is poured with oxygen. EFFECT: expanded application field, reduced cost of blasting operations.
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF DOING BLASTING OPERATIONS WITH OXYLIQUIT ( VARIANTS ) | 1997 |
|
RU2130582C1 |
CHARGE OF IMPACT INITIATION | 1992 |
|
RU2039251C1 |
METHOD FOR INSTALLATION OF BLASTING NETWORK FOR CRUSHING OF DIFFICULTY EXPLOITABLE ROCKS | 1998 |
|
RU2150673C1 |
METHOD FOR HOLE BLASTING | 2001 |
|
RU2210056C2 |
METHOD FOR INSTALLATION OF BLASTING NETWORK OF SERIES OF OUTBURST CHARGES | 1998 |
|
RU2151373C1 |
METHOD FOR PREPARING ROCKS FOR EXCAVATION | 1995 |
|
RU2099529C1 |
METHOD OF BLAST-HOLE CHARGING AND BLASTING | 1994 |
|
RU2064658C1 |
GEAR FOR REMOTE INITIATION OF EXPLOSIVE CHARGES | 1998 |
|
RU2146802C1 |
METHOD OF BLASTING OF LOW-STABLE ORE BODIES | 1992 |
|
RU2089844C1 |
INDUSTRIAL EXPLOSIVE | 2017 |
|
RU2698834C1 |
Authors
Dates
1995-07-25—Published
1992-12-07—Filed