FIELD: blasting, in particular, methods for blasting, applicable in digging of canals, trenches, foundation ditches in rocks. SUBSTANCE: the method consists in placement of charges in rock masses, installation of live primers in charges, installation of blasting network with detonating cord and detonation from the detonating cap. The distinction is in the fact that the detonating cap is connected to the middle of the detonating cord, whose ends are connected to the middles of the additional detonating cords between the charge live primers. Besides, the ends of the additional detonating cords are connected to the middles of the second group of detonating cords connecting in pairs the live primers. Besides, the live primers are interconnected by a duplicating detonating cord. EFFECT: reduced labour content of preparation of rock mass to outburst. 3 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR INSTALLATION OF BLASTING NETWORK FOR CRUSHING OF DIFFICULTY EXPLOITABLE ROCKS | 1998 |
|
RU2150673C1 |
METHOD FOR FORMATION OF WATER-PROOF EXPLOSIVE CHARGE IN ENTRY FOR ORE-BREAKING | 2001 |
|
RU2210055C2 |
METHOD FOR BLASTING OF DEEP-HOLE CHARGES | 2003 |
|
RU2234052C1 |
METHOD OF ROCK BLASTING AND BOREHOLE CHARGE FOR ITS IMPLEMENTATION | 2021 |
|
RU2766994C1 |
METHOD FOR CONDUCTING OF DRILLING AND BLASTING OPERATIONS | 2001 |
|
RU2184928C1 |
EXPLOSIVE CHARGE INITIATION SYSTEM | 2005 |
|
RU2285897C1 |
METHOD FOR FORMATION OF EXPLOSIVE CHARGE IN ENTRY FOR ORE-BREAKING | 2000 |
|
RU2166728C1 |
DEEP-HOLE CHARGE FOR SMOOTH BLASTING | 0 |
|
SU1792519A3 |
METHOD FOR FORMATION OF CHARGE IN WELL COMBINED OPEN-UNDERGROUND MINING | 2019 |
|
RU2725721C1 |
METHOD FOR ROCK BLASTING | 2009 |
|
RU2410640C1 |
Authors
Dates
2000-06-20—Published
1998-03-05—Filed