FIELD: flexible hoses. SUBSTANCE: thread is used in assembling flexible hose. One end of thread is connected with end of reinforcement spiral. Other end of spiral is fixed. Prior to introduction of reinforcement spiral, thread is pulled through shielding. Reinforcement spiral is introduced by applying tensioning effort to reinforcement spiral through pulled-through thread. With reinforcement spiral fitted in, tensioning effort is removed. EFFECT: enlarged operating capabilities. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
FLEXIBLE HOSE | 1992 |
|
RU2015916C1 |
THERMAL DRIVE | 1991 |
|
RU2013659C1 |
GRIPPER | 1992 |
|
RU2035291C1 |
V VOKHMYANIN'S METHOD OF MAKING HOLES IN PARTS | 2011 |
|
RU2471602C1 |
DEVICE FOR REPAIR OF HOLES IN SHIP'S HULL | 1990 |
|
RU2005642C1 |
FLEXIBLE PIPE AND METHOD OF MANUFACTURING THE SAME | 0 |
|
SU949283A1 |
VG VOKHMYANIN'S METHOD OF MAKING LONG HOLES IN PARTS | 2013 |
|
RU2554841C1 |
FLOWER POT | 1992 |
|
RU2011335C1 |
METHOD FOR STUMP SPLITTING | 1991 |
|
RU2017403C1 |
SPINNING TOP | 1991 |
|
RU2008061C1 |
Authors
Dates
1995-08-27—Published
1993-06-03—Filed