FIELD: development of oil fields. SUBSTANCE: first, oil field is drilled with vertical wells by employing wide well spacing pattern. Then, producing wells are drilled for each layer with horizontal well bores. Beginning and end of horizontal wellbore are located at the same distance from the source of displacing agent. Wellbore length of the producing well in producing level is established proportional to oil reserves and inversely proportional to their productivity. Length of well bore in horizontal producing wells in coupling rows is set not in excess of 70% of distance to well pattern. EFFECT: higher efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF OIL DEPOSIT MADE UP OF NONUNIFORM RESERVOIRS | 1994 |
|
RU2085723C1 |
PROCESS OF EXPLOITATION OF MULTIPOOL OIL DEPOSIT | 1993 |
|
RU2057913C1 |
METHOD FOR DEVELOPMENT OF MASSIVE-TYPE DEPOSIT | 1995 |
|
RU2095551C1 |
METHOD FOR EXPLOITATION OF OIL DEPOSIT OF COMPLEX STRUCTURE IN LATE STAGE | 1993 |
|
RU2077663C1 |
METHOD OF DEVELOPMENT OF NONUNIFORM-HORIZON OIL DEPOSIT | 1999 |
|
RU2172396C2 |
METHOD FOR FLOODING OIL DEPOSIT | 1994 |
|
RU2072032C1 |
METHOD OF DEVELOPMENT OF OIL DEPOSIT | 1999 |
|
RU2172395C2 |
METHOD OF DEVELOPMENT OF OIL POOL HAVING RESERVOIR PITCHING-OUT ZONES | 1994 |
|
RU2090743C1 |
METHOD FOR DEVELOPING OIL DEPOSITING CARBONATE COLLECTORS OF FISSURE-CAVITY TYPE | 1992 |
|
RU2073791C1 |
METHOD FOR DEVELOPMENT OF NONUNIFORM OIL DEPOSIT | 1996 |
|
RU2101475C1 |
Authors
Dates
1994-12-15—Published
1991-07-22—Filed