FIELD: water-development works. SUBSTANCE: in compliance with process of erection of hydraulic power station from floating module units part of water area is fenced off and drained, foundation is laid in its bottom, fenced-off area os flooded and floating module units are mounted on foundation. Part of water area is fenced off by means of transportable floating air-lock chamber. Floating module units are mounted on foundation by change of water level in lock chamber. EFFECT: expanded application field. 20 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF ERECTION OF HYDRAULIC POWER STATION FROM MODULE UNITS | 1992 |
|
RU2045614C1 |
MOBILE BUILDING COMPLEX | 1992 |
|
RU2082861C1 |
METHOD FOR CONSTRUCTION OF GEOTECHNICAL STRUCTURES IN THE WATER AREA OF URBAN RIVERS AND CANALS | 2022 |
|
RU2791119C1 |
UNDERWATER GARAGE FOR VEHICLES AND METHOD TO CONSTRUCT UNDERWATER GARAGE | 2010 |
|
RU2468151C2 |
METHOD TO CONSTRUCT FLOAT HYDRAULIC POWER PLANT COMBINED WITH LOCK CHAMBER | 2012 |
|
RU2499867C1 |
METHOD OF BLOCK-MODULAR CONSTRUCTION OF HYDRAULIC STRUCTURES IN UNDERWATER PITS | 2009 |
|
RU2401356C1 |
CONSTRUCTION METHOD OF ORTHOGONAL THRESHOLD POWER PLANT (OTPP) COMBINED WITH SHIP PASSAGE (SP) | 2012 |
|
RU2543904C2 |
TRANSPORT JUNCTION AND METHOD FOR CONSTRUCTION THEREOF | 2015 |
|
RU2587673C1 |
METHOD OF ERECTION OF UNDERGROUND STRUCTURES ALONG RIVER BED OR CANAL | 2018 |
|
RU2686206C1 |
METHOD FOR STRUCTURE CONSTRUCTION IN THE UNDER-RUNNER SPACE OF RIVERS AND CANALS IN URBAN DEVELOPMENT | 2021 |
|
RU2770187C1 |
Authors
Dates
1995-10-10—Published
1992-04-10—Filed