FIELD: civil engineering, concerns the floating method of erection of water- development works. SUBSTANCE: complex has base and a number of longitudinal and lateral cofferdams fencing off the water area in zone of construction, as well as means for changing water level of water area fenced off by these cofferdams; longitudinal and lateral cofferdams are made as pontoon dock-gates, each of them has casing with tank installed inside it for vertical movement relative the casing; pontoon dock-gates have means for conjugation to one another and to mechanisms for attachment and conjugation to complex base. EFFECT: enhanced capacity. 8 cl, 16 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF ERECTION OF HYDRAULIC POWER STATION FROM MODULE UNITS | 1992 |
|
RU2045614C1 |
PROCESS OF ERECTION OF HYDRAULIC POWER STATION FROM FLOATING MODULE UNITS | 1992 |
|
RU2045613C1 |
MINE BARRIER | 1994 |
|
RU2065974C1 |
METHOD OF UNDERWATER MINING | 1995 |
|
RU2097565C1 |
METHOD OF CONSTRUCTING RECREATION COMPLEX ABOVE SEA AREA NEARBY UNUSED HIGH CLIFFED COAST WITH NO BEACHES | 2011 |
|
RU2474649C2 |
SCREEN SIEVE | 1993 |
|
RU2119833C1 |
TRAVELLING APPARATUS FOR MANUFACTURING PRODUCTS FROM CONCRETE MIXTURES | 1993 |
|
RU2033320C1 |
FOUNDATION ENVELOPE OF FLOATING BLOCK INSTALLED AT WATER AREA BOTTOM USING FLOAT-ON METHOD | 2011 |
|
RU2473739C1 |
METHOD FOR ERECTION OF BRIDGE ON WATER AREA | 2011 |
|
RU2483153C2 |
METHOD TO MANUFACTURE FLOAT-ON ELEMENTS OF HYDRAULIC ENGINEERING STRUCTURE | 2012 |
|
RU2494191C1 |
Authors
Dates
1997-06-27—Published
1992-04-10—Filed