FIELD: civil engineering, metalwork production. SUBSTANCE: first origin beam wall is cut over horizontal cutting lines in checkered order, then over vertical lines. In so doing, both upper and lower horizontal lines are overlapped by "h" value, where "h" is projection height. Length of horizontal cutting lines is 2.828h, distance between the lines is 0.828h. Squares cut off the wall are cut in half over diagonal, the triangular are welded with their legs to form triangular insertion pieces. Five-cornered elements with right angle at apex are cut off from projections of upper half-beam. The elements are cut in half height. The halves are welded to one another to form elements with V-shaped projections. The elements formed are welded to projections of the lower half-beam. End elements and triangular insertion pieces are welded too. EFFECT: decreased amount of man-hours in beam production, increased bearing capacity of the beam. 8 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR MANUFACTURING LIGHT-WEIGHT METAL BEAM | 0 |
|
SU1795035A1 |
METHOD FOR MANUFACTURE OF LIGHTWEIGHT METAL STRUCTURES | 1997 |
|
RU2148132C1 |
METHOD OF MANUFACTURING LIGHT-WEIGHT METAL BEAM | 0 |
|
SU1798457A1 |
METHOD FOR MANUFACTURE OF LIGHTWEIGHT METAL STRUCTURES | 1997 |
|
RU2148131C1 |
METHOD OF FABRICATING LIGHTWEIGHT STEEL BEAMS | 0 |
|
SU1821536A1 |
METHOD OF MANUFACTURING LIGHT-DUTY METAL BEAM | 0 |
|
SU1738965A1 |
METHOD FOR MANUFACTURE OF METAL BEAM WITH PERFORATED WEB | 1994 |
|
RU2087642C1 |
DEFLECTOR-VORTEX GENERATOR | 1996 |
|
RU2128129C1 |
METHOD OF MANUFACTURING LIGHTWEIGHT BEAMS WITH PERFORATED WEB | 0 |
|
SU1189965A1 |
CONNECTION UNIT FOR RODS OF SPACIOUS STRUCTURE | 1993 |
|
RU2087634C1 |
Authors
Dates
1995-10-27—Published
1992-11-26—Filed