FIELD: construction industry. SUBSTANCE: partial removal of load acting on reinforced concrete beam is carried out by opposite bending of beam with rated value. Tested beam is kept under this load for the course of 4-10 min. Parameters of kinetics of creep flow are found. Original bending is rebuilt with specified rate. Rise of bending is measured for 2 min. Level of stresses is evaluated with the use of data obtained by graduation dependances determined in advance. EFFECT: enhanced authenticity of method.
Title | Year | Author | Number |
---|---|---|---|
METHOD OF TESTING BUILDING STRUCTURE COMPONENTS | 0 |
|
SU1101709A1 |
TESTING METHOD OF CONSTRUCTIONS AND DEVICE FOR ITS IMPLEMENTATION | 2013 |
|
RU2530470C2 |
METHOD FOR DIAGNOSTICS OF TECHNICAL CONDITION OF STEEL REINFORCED CONCRETE SPANS | 2009 |
|
RU2411478C2 |
CALCULATION METHOD OF ELASTICITY MODULUS AND CONCRETE AND MORTAR CREEP PROPERTIES | 2007 |
|
RU2339945C2 |
METHOD FOR DETERMINING THE BEARING CAPACITY OF A SPAN | 2021 |
|
RU2771598C1 |
PRESTRESSED REINFORCED CONCRETE BEAM WITH ADJUSTABLE STRAINING FORCE | 1999 |
|
RU2213187C2 |
METHOD FOR DETERMINING THE TECHNICAL CONDITION OF REINFORCED CONCRETE BEAMS OF SUPERSTRUCTURES OF OPERATED MOTOR ROAD BRIDGES BY DEFLECTIONS THEREOF | 2020 |
|
RU2767165C2 |
METHOD OF TEST OF BUILDING FRAME UNIT | 2007 |
|
RU2331858C1 |
METHOD FOR CONTROLLING STIFFNESS OF SINGLE-SPAN BEAMS MADE OF PHYSICALLY NONLINEAR MATERIAL | 2013 |
|
RU2538361C2 |
VIBRATION TESTING METHOD TO CONTROL TECHNICAL BRIDGE SPAN STATE | 2005 |
|
RU2284489C1 |
Authors
Dates
1995-11-10—Published
1992-07-29—Filed