METHOD OF TEST OF BUILDING FRAME UNIT Russian patent published in 2008 - IPC G01M5/00 

Abstract RU 2331858 C1

FIELD: physics.

SUBSTANCE: floor panels are loaded with uniformly distributed load. Sagging value is determined at various loads with the help of levelling and a gauge post. Bearing capacity of a cell is defined. Deformation character of contact joints is defined for the conjunction zone of column faces with floor panel grooves. Strain of the middle part of floor panels and column compression are measured with a mechanical strain gauge. Residual deformation of construction elements after load relieving is determined. Cell tests are carried out after concreting of contact joints and stretching and holding-down of wire-rope fittings, before embedment of rope-wire fitting channels. Frame mesh is loaded by piece weights in 6 stages, leaving each load stage for 3 days, till the rupture load is reached. For more uniform load distribution the cell surface is strewn with 30 mm deep sand layer. Load pieces are laid at distance over 20 mm from each other simultaneously from two sides of columns, the layout finished in the centre of the cell. Vertical shift of panels is measured with clock-type indicators, and all deformations are measured at the most threatening zones according to the measurement procedure.

EFFECT: reliability evaluation for a construction frame unit.

4 cl, 4 dwg

Similar patents RU2331858C1

Title Year Author Number
METHOD OF TESTING STRUCTURAL SYSTEMS AND REINFORCED CONCRETE BUILDING ELEMENTS FOR RELIABILITY UNDER FIRE AND FORCE LOADS 2018
  • Tamrazyan Ashot Georgievich
  • Zvonov Yurij Nikolaevich
RU2688891C1
METHOD OF PRESTRESSED ROPE ARMATURE GUY IN CONSTRUCTION CONDITIONS AND DEVICE FOR ITS REALISATIONS (VARIANTS) 2006
  • Shichkin Aleksandr Ivanovich
  • Ragozin Aleksandr Nikolaevich
  • Ozerov Vladimir Aleksandrovich
RU2328578C1
METHOD OF CONSTRUCTING FRAMEWORK WITHOUT LONGITUDINAL GIRDER 2006
  • Shichkin Aleksandr Ivanovich
  • Ragozin Aleksandr Nikolaevich
  • Ozerov Vladimir Aleksandrovich
  • Shvets Aleksandr Valer'Evich
RU2325487C1
METHOD OF PRELIMINARY TENSED CONSTRUCTION FRAME AND CASING ERECTION 2006
  • Shichkin Aleksandr Ivanovich
  • Ragozin Aleksandr Nikolaevich
  • Goldobin Nikolaj Viktorovich
RU2328579C1
METHOD FOR REINFORCEMENT ROPE TIGHTENING DURING BUILDING ERECTION IN ACCORDANCE WITH INDUSTRIAL ERECTION SYSTEM 2002
  • Martynov A.A.
RU2264506C2
FERROCONCRETE ROOF 0
  • Shugaev Vladimir Vasilevich
  • Sokolov Boris Sergeevich
  • Zajtsev Leonid Nikolaevich
  • Kimberg Aleksandr Mikhajlovich
SU1622545A1
PROCESS OF TENSION OF CABLE REINFORCEMENT WHILE MANUFACTURING PREFABRICATED-MONOLITHIC FLOORS OF BUILDINGS WITH SPANNER-FREE FRAME 2001
  • Martynov A.A.
RU2199632C1
METHOD OF BUTT JOINTING OF CEILING PLATES WITH COLUMN AND DEVICE FOR ITS IMPLEMENTATION 2007
  • Shichkin Aleksandr Ivanovich
  • Ragozin Aleksandr Nikolaevich
  • Goldobin Nikolaj Viktorovich
  • Shvets Aleksandr Valer'Evich
RU2334060C1
BUILT-UP-MONOLITHIC REINFORCED-CONCRETE FRAME OF MANY-STORIED BUILDING "KAZAN-100" 2001
  • Mustafin I.I.
  • Garanin V.N.
RU2184816C1
METHOD FOR TENSIONING OF HIGH-STRENGTH REINFORCING STEEL IN MANUFACTURE OF FLOORS OF PRECAST-MONOLITHIC BUILDINGS WITH FRAME WITHOUT CROSS-BARS 1999
  • Martynov A.A.
RU2182627C2

RU 2 331 858 C1

Authors

Shichkin Aleksandr Ivanovich

Ragozin Aleksandr Nikolaevich

Ozerov Vladimir Aleksandrovich

Shvets Aleksandr Valer'Evich

Dates

2008-08-20Published

2007-02-07Filed