FIELD: hydraulic engineering; erection of berthing and guard structures; underwater construction in development of shelf. SUBSTANCE: support members of gravity structure are formed by pouring quick-setting material into containers secured under the foundation slabs of the block. Before setting of this material, a support force is applied from outside to the hollow block. The container used for building up the support members is made of a flexible watertight material and the minimum thickness of the container is not less than maximum elevation of the design position of the lower end of foundation slabs above the bearing surface. EFFECT: higher efficiency. 2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ERECTING A GRAVITY STRUCTURE | 1991 |
|
RU2022084C1 |
FOUNDATION OF FLOATING MASSIF INSTALLED ONTO BASE BY FLOAT-ON METHOD | 2011 |
|
RU2473743C2 |
METHOD OF ERECTING UNDERWATER WATER-DEVELOPMENT STRUCTURES | 0 |
|
SU1021687A1 |
METHOD FOR ERECTING SUPPORT IN WATER OBSTACLE | 2003 |
|
RU2245962C1 |
METHOD OF CONSTRUCTING UNDERWATER HYDRAULIC ENGINEERING STRUCTURE | 0 |
|
SU1308682A1 |
BLOCK MADE OF SHELLS | 0 |
|
SU1124081A1 |
METHOD OF CONSTRUCTION OF THE PORT HYDRAULIC STRUCTURE | 2017 |
|
RU2656399C1 |
METHOD AND DEVICE FOR WATERPROOFING CRACKS IN HYDRAULIC STRUCTURES, CONCRETE AND MASONRY STRUCTURES | 1999 |
|
RU2243318C2 |
0 |
|
SU264230A1 | |
GUARD BREAKWALL, MAINLY FOR YACHT PORTS | 2009 |
|
RU2406799C1 |
Authors
Dates
1995-11-20—Published
1993-03-12—Filed