FIELD: port construction. SUBSTANCE: when a gravity structure is erected under the shore conditions a hollow block is made, delivered and disposed in the place of its installation leaning with its bed plates on the supporting members. The latters are molded by means of pouring off part of the volume of the stone bed. The stone bed is poured off through the compartments of the hollow block. The vibration thickening of the upper part of the stone bed is exercised and the loose material is poured off into the block inner cavities. EFFECT: quick erection of the mooring and protecting structures. 1 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ERECTION OF GRAVITY WORKS IN WATER AREA | 1993 |
|
RU2048639C1 |
FOUNDATION OF FLOATING MASSIF INSTALLED ONTO BASE BY FLOAT-ON METHOD | 2011 |
|
RU2473743C2 |
TEMPORARY MOORING STRUCTURE | 2020 |
|
RU2732938C1 |
METHOD OF CONSTRUCTION OF THE PORT HYDRAULIC STRUCTURE | 2017 |
|
RU2656399C1 |
METHOD FOR THE CONSTRUCTION OF A HYDRAULIC STRUCTURE OF A NAVAL BASE | 2021 |
|
RU2775074C1 |
METHOD FOR ERECTING REINFORCED CONCRETE HEAD OF A THIN WALL | 1991 |
|
RU2039148C1 |
HYDRAULIC ENGINEERING STRUCTURE | 0 |
|
SU852999A1 |
METHOD FOR ERECTING HEAD OF THIN SHEET PILING WALL | 1991 |
|
RU2022085C1 |
BERTHING STRUCTURE | 1996 |
|
RU2119004C1 |
GUARD BREAKWALL, MAINLY FOR YACHT PORTS | 2009 |
|
RU2406799C1 |
Authors
Dates
1994-10-30—Published
1991-06-27—Filed