FIELD: hydraulic engineering. SUBSTANCE: hydraulic structure is made of shells 1 installed on prepared base and filled with filling material 2. Shells are connected by superstructure 3. Lower end of each shell has bevel 6 corresponding to bottom inclination in point of installation of shell into structure. EFFECT: higher efficiency. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ERECTING HYDROENGINEERING CONSTRUCTION | 1992 |
|
RU2039149C1 |
METHOD FOR BUILDING RETAINING WALL | 0 |
|
SU1705471A1 |
HYDRAULIC ENGINEERING CONSTRUCTION | 1992 |
|
RU2050429C1 |
FACILITY FOR PROTECTION OF WATER BODIES AND BEACHES FROM WAVES | 0 |
|
SU1836522A3 |
METHOD FOR BUILDING RETAINING WALL | 0 |
|
SU1719530A1 |
HYDRAULIC CONSTRUCTION | 0 |
|
SU1802032A1 |
MOORING EMBANKMENT | 0 |
|
SU1420096A1 |
MOORING EMBANKMENT OF VERTICAL TYPE | 2018 |
|
RU2690426C1 |
HYDRAULIC STRUCTURE | 0 |
|
SU1477814A1 |
MODULE OF BANK PROTECTION CONSTRUCTION | 2002 |
|
RU2229553C1 |
Authors
Dates
1995-12-10—Published
1993-05-25—Filed