FIELD: civil engineering. SUBSTANCE: arch with balancing supports in the base is stressed with flexible belt laid on outer surface of the arch. Upper and lower balancers are coupled to one another and rested onto a pivot rigidly fixed with their ends in the base. The flexible belt is fastened to the lower balancer to be stretched. EFFECT: increased load capacity of the two- hinge arch at the expense of stressing the arch with lengthwise force and balancers pitched on the pivot. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
ARCH BRIDGE | 1992 |
|
RU2064547C1 |
FLOATING BELT BRIDGE | 1989 |
|
RU2008391C1 |
BUILDING OR CONSTRUCTION AND ARCH | 1993 |
|
RU2047705C1 |
METHOD FOR TRANSFER OF LONG-SPAN STEAM-AND-WATER MIXTURE DELIVERY PIPELINE OVER CANYON LOCATED IN SEISMICALLY ACTIVE ZONE | 2023 |
|
RU2815705C1 |
METHOD OF ERECTION OF SHELLS ON PNEUMATIC FALSEWORK | 1994 |
|
RU2112120C1 |
SUSPENDED SYSTEM | 0 |
|
SU920151A1 |
HYDROCYCLONE AERATION TANK AND AERATING DEVICE | 1992 |
|
RU2046765C1 |
FOLDING ROOF | 0 |
|
SU1747618A1 |
ROOF CONSTRUCTION METHOD | 0 |
|
SU912872A1 |
PREFABRICATED SKELETON OF DOME STRUCTURE | 0 |
|
SU1201444A1 |
Authors
Dates
1995-12-10—Published
1992-02-03—Filed