FIELD: construction.
SUBSTANCE: invention relates to the field of construction and can be used in the construction of long-span crossings of the steam-and-water mixture delivery pipeline. Method of transfer of large-span pipelines for delivery of steam-and-water mixture over a canyon located in a seismically active zone involves construction of a bridge with a metal arched span with passage of long-span sections of pipelines for supply of steam-and-water mixture "in the middle".
EFFECT: high reliability of long-span pipelines above a canyon located in a seismically active zone.
1 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR RECONSTRUCTION OF OVERPASS WITH DISPLACEMENT OF RECONSTRUCTED RAILWAY BRIDGE AFLOAT | 1999 |
|
RU2152477C1 |
METHOD FOR DISASSEMBLY OF ARCH BRIDGE | 2022 |
|
RU2800582C1 |
METHOD FOR ERECTION OF PEDESTRIAN OVERPASS | 1999 |
|
RU2152475C1 |
RING HIGHWAY OF MEGAPOLICE AND METHOD FOR ITS RECONSTRUCTION | 1998 |
|
RU2136803C1 |
GROUND FILLING BRIDGE | 2023 |
|
RU2822619C1 |
COLLAPSIBLE UNIVERSAL BRIDGE | 2014 |
|
RU2578231C1 |
METHOD OF RECONSTRUCTION OF BRIDGEWORK WITH DISPLACEMENT OF RAILWAY BRIDGE FRAMEWORK AFLOAT AND ERECTION OF PEDESTRIAN BRIDGE | 2000 |
|
RU2198978C2 |
METHOD TO ERECT PILE BRIDGE FOOTINGS ON WATER AREA | 2010 |
|
RU2447226C2 |
PROCESS OF RECONSTRUCTION OF BEAM BRIDGE | 2003 |
|
RU2225912C1 |
REMOVAL METHOD OF BRIDGE SUPERSTRUCTURE USING CABLE-SUPPORTED SYSTEM | 2013 |
|
RU2534557C1 |
Authors
Dates
2024-03-20—Published
2023-09-14—Filed