FIELD: mechanical engineering. SUBSTANCE: pipe sections are laid along route. Pipe line is extended by pipe sections by welding their joints. Then lengths are laid in trench which is filled-in and pipe line is tested for strength and tightness. Tests are carried out by individual sections before laying them in trench. Tests of pipes for strength and tightness are conducted simultaneously with connecting next section. Sections under test are arranged lengthwise slightly overlapping each other. Length of section under test is no less than length of pipe section. EFFECT: enhanced reliability. 6 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
ARRANGEMENT FOR TESTING PIPELINES FOR STRENGTH | 0 |
|
SU1375958A1 |
DEVICE FOR LAY OF COMMUNICATION ON RESERVOIR BOTTOM | 1999 |
|
RU2164637C1 |
METHOD FOR TRENCHLESS CONSTRUCTION OF TRUNK PIPELINE LENGTH UNDER OBSTACLE | 1996 |
|
RU2127347C1 |
FRAME SUPPORT FOR INSULATED PIPELINES AND PIPE SECTIONS | 2003 |
|
RU2221956C1 |
PRODUCTION METHOD OF EXCAVATION AND LAYING WORKS AT ROUTING OF UNDERWATER PIPELINES, AND DEVICE FOR ITS IMPLEMENTATION | 2011 |
|
RU2507431C2 |
METHOD AND DEVICE FOR TRENCHLESS LAYING OF UNDERGROUND SERVICE LINES UNDER OBSTACLES | 1997 |
|
RU2126871C1 |
METHOD FOR CYCLIC HYDRAULIC TESTING OF DEFECTIVE PIPE SECTIONS AND BENCH FOR ITS IMPLEMENTATION | 2023 |
|
RU2809307C1 |
METHOD OF LAYING FLEXIBLE POLYMER/METAL TUBES | 0 |
|
SU1476226A1 |
DEVICE AND METHOD OF CONNECTION PIPES OF PROTECTIVE CASING AND WORKING PIPELINE PLACED THEREIN | 2016 |
|
RU2645378C2 |
METHOD OF EFFECTING BIOCHEMICAL PROCESSES IN THE BODY OF THE POLYGON TBO | 2018 |
|
RU2729744C2 |
Authors
Dates
1995-12-10—Published
1989-05-30—Filed