FIELD: construction. SUBSTANCE: jet unit for erection of bored piles has triangular frame, carriage of hydraulic giant and hydraulic giant attached to it. Hydraulic giant consists of rotator, swivel, pipe string and giant head. Hydraulic giant carriage and hydraulic giant are installed on inclined member of frame with pipe string of hydraulic giant resting on roller support. Mounted on frame are fixed and movable platforms. Attached to fixed platform is body of hydraulic cylinder, and its rod is connected with movable platform. Hydraulic giant carriage with the help of rope engaged with blocks forms closed kinematic system with pulley block located on movable platform. EFFECT: higher efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
MOBILE TELESCOPIC DRILLING DEVICE OF VERTICAL DRILLING | 2013 |
|
RU2538550C1 |
MARINE ICE-STRENGTHENED PLATFORM | 2016 |
|
RU2634143C1 |
MARINE ICE-RESISTANT PLATFORM | 2016 |
|
RU2640345C1 |
STATIONARY AUTO-MOUNTED DRILL RIG | 2013 |
|
RU2533411C1 |
DRILLING ELECTRIC MACHINE (VARIANTS) | 2022 |
|
RU2793524C1 |
MOBILE DRILLING RIG | 2016 |
|
RU2647522C2 |
DRILL STRING FOR ERECTION OF BORED PILE IN SOIL-CEMENT CLADDING | 2019 |
|
RU2735077C1 |
DRILLING CROWN BIT | 0 |
|
SU1393900A1 |
INSTALLATION FOR WELDING SECTORS OF PIPE BENDS | 2021 |
|
RU2780860C1 |
SHAFT LINING, COMPLEX FOR ITS ERECTION AND METHOD OF ITS ERECTION | 2012 |
|
RU2502873C1 |
Authors
Dates
1996-02-10—Published
1993-03-29—Filed