FIELD: well drilling. SUBSTANCE: geophysical instrument is run into well in protective container together with pipe lengths used as attachments and connected tightly to one another with sealed upper and lower ends. Formed internal cavity is filled with air. Pipe lengths are suspended from cable with the help of clamping seal, and airtightness of pipe internal cavity is ensured by means of sealing. EFFECT: excluded sticking of load in delivery of geophysical instruments into well horizontal sections. 2 dwg
Authors
Dates
1996-02-20—Published
1992-05-22—Filed