FIELD: drilling of deep intensively inclined oil wells. SUBSTANCE: geophysical device is run into well. It is mechanically connected to lower end of the first pipe and electrically connected with lower end of cable length. All pipes of set are successively lowered and connected alternately with one another mechanically and electrically. Upon completion of lowering of all pipes, connected mechanically and electrically to upper end of last pipe is logging cable with the aid of special cable lug. The whole system is lowered into well bore horizontal section and device delivered to interval of investigation. Information is registered in device hoisting. EFFECT: higher reliability, extended field of method application and higher accuracy in measurement of geophysical parameters. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DELIVERING GEOPHYSICAL INSTRUMENT INTO HORIZONTAL WELL | 1996 |
|
RU2109136C1 |
METHOD FOR DELIVERY OF GEOPHYSICAL INSTRUMENT INTO HORIZONTAL WELL | 1992 |
|
RU2054519C1 |
DEVICE FOR DELIVERY GEOPHYSICAL INSTRUMENTS INTO HORIZONTAL WELL | 1993 |
|
RU2054539C1 |
DEVICE FOR HORIZONTAL WELL LOGGING | 1993 |
|
RU2054538C1 |
DEVICE FOR INVESTIGATION OF HORIZONTAL WELLS | 1996 |
|
RU2117154C1 |
GEAR TO EXAMINE HORIZONTAL HOLES | 1996 |
|
RU2109941C1 |
METHOD OF GEOPHYSICAL INSTRUMENTS DELIVERY INTO HORIZONTAL BORE-HOLE | 1992 |
|
RU2029860C1 |
DEVICE FOR INVESTIGATION OF HORIZONTAL WELLS | 1996 |
|
RU2108459C1 |
DEVICE FOR INVESTIGATION OF HORIZONTAL WELLS | 1996 |
|
RU2114298C1 |
DEVICE FOR INVESTIGATION OF WELLS | 1996 |
|
RU2108458C1 |
Authors
Dates
1999-05-27—Published
1996-07-05—Filed