FIELD: oil and gas production. SUBSTANCE: gear is composed of hollow housing 1 with threaded connections to couple it to drill pipe string. Blade in the form of truncated cone is made fast to housing. Blades are set with hard material to improve their wear resistance. Triangular straps are continuations of side lines of blades and are attached above them. Plane of cross-section of truncated cone of blades forms together with rotational axis of gear angle Ψ1, determined by formula Ψ1=90°-Ψ-ΔΦ, where Φ is angle formed by vector of relative velocity of particle movement and rotational axis of gear found from relation specified in text of description; angle Dv - is formed by vector of relative velocity of particle movement and plane of axial section of blade determined from relation ΔΦ=arctg(sinβ/sinα),deg., where β - is inclination angle of conical surface to well wall in plane of angle Ψ1, amounting to ±5 deg; α - is angle formed by surfaces of segments of truncated cone with wall of well in cross-section of gear found by formula α=arcsin[(Dк/2ρ)-1], deg., , where ρ - is curvature radius of blades, m; α is wedge-shaped clearance with well wall in plane of axial section of blade within range 0 ≅ tgα < f,, where is friction coefficient of hard particles against rock found from relation α = arcsin(sinαn/ cos ΔΦ), deg,. Average angle of inclination of triangular straps to rotational axis is determined by following inequality Ψ2<arctgfм, where fm is friction coefficient of pressed sludge against metal. Gear is placed above drill bit and is lowered on drill pipe string into interval where intensive absorption is possible. Then well is washed with drilling mud with simultaneous rotation of drill bit, after this drilling of well is started. EFFECT: treatment of cavernous and jointing formations. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
BIT FOR ROTARY DRILLING | 1993 |
|
RU2061831C1 |
METHOD OF WELL DRILLING IN HIGH-PERMEABILITY INCOMPETENT GAS-CONTAINING FORMATIONS | 1996 |
|
RU2121558C1 |
CLAYLESS HIGH-MINERALIZED LIQUID FOR REPAIR-RESTORATION WORK PERFORMING | 1990 |
|
RU2028362C1 |
METHOD AND APPARATUS TO DETERMINE BEGINNING OF STRATUM FLUID APPEARANCE AND ABSORPTION OF DRILLING MUD | 1990 |
|
RU2032071C1 |
COMPOUND FOR TEMPORARY ISOLATION OF BED | 1991 |
|
RU2012776C1 |
METHOD FOR TEMPORARY ISOLATION OF A GAS-BEARING STRATUM | 1991 |
|
RU2013526C1 |
METHOD FOR CONSTRUCTION OF GRAVEL PACKING AND DEVICE FOR ITS REALIZATION | 1990 |
|
RU2023140C1 |
FOAMING COMPOSITION FOR REPAIR WORKS IN THE HOLE | 1992 |
|
RU2033417C1 |
METHOD FOR CLEANING BOTTOM-HOLE FORMATION ZONE | 1989 |
|
SU1835136A3 |
METHOD OF REVEALING ZONES OF NATURAL BRINES | 1991 |
|
RU2012905C1 |
Authors
Dates
1996-04-10—Published
1993-12-28—Filed