FIELD: oil production. SUBSTANCE: maps of stressed state, permeability and moisture capacity are built for area of oil field. On their basis problems of more precise definition of contours of oil field during prospecting operations, design of network of wells, sequence of development of oil field and conditions of exploitation of production and injection holes are decided. Injection holes are positioned predominantly in relatively stressed zones and production ones - in relatively unloaded zones. EFFECT: improved exploitation capabilities of oil pools. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PRELIMINARY DRAINING OF DEPOSIT | 1992 |
|
RU2027022C1 |
METHOD OF BURIAL OF RADIOACTIVE AND OTHER HARMFUL WASTE | 1992 |
|
RU2029401C1 |
METHOD OF GEODYNAMIC OF SECTION OF THE EARTH'S CRUST | 1992 |
|
RU2065189C1 |
METHOD OF BURIAL OF RADIOACTIVE AND OTHER HARMFUL WASTE | 1992 |
|
RU2022377C1 |
METHOD OF HYDROCARBON DEPOSITS DEVELOPMENT | 1999 |
|
RU2148166C1 |
METHOD FOR DEVELOPING A PETROLEUM AND GAS FIELD | 2021 |
|
RU2779941C1 |
METHOD OF COAL ROCK DUMPS SITES SELECTING | 2017 |
|
RU2657302C1 |
METHOD OF SURFACE FACILITIES PROTECTION FROM CONSEQUENCE OF DEFORMATION PROCESSES INITIATED BY DEVELOPMENT OF OIL AND GAS DEPOSITS | 2010 |
|
RU2450105C1 |
METHOD OF MINING BUMP-PRONE DEPOSITS | 0 |
|
SU1693262A1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2014 |
|
RU2556094C1 |
Authors
Dates
1996-04-10—Published
1992-03-16—Filed