FIELD: assembly of rail length. SUBSTANCE: production line includes a bay to prepare sleepers to assembly and parallel bay to assemble rail lengths. Sleeper preparing bay includes sleeper storage, sleeper feeder, step-by-step conveyor, drilling machine to drill holes in sleepers, and conveyor-storage. Rail length assembly bay includes sleeper feed mechanism related to conveyor-storage, press-unit with a device for feeding fastener kits, and a conveyor for rails and finished rail lengths. Sleeper storage is of two decks. Lower deck is formed by the conveyor of new sleepers, and upper deck includes a train of input, intermediate, and feed conveyor for old good sleepers installed on one frame. Conveyor drives of sleeper storage are interconnected to control set-point device for setting number and extent of sleeper wear, to set the number of new and old sleepers alternately fed to assembly bay, and to assure turning appropriate conveyor on for feeding new or old good sleeper to the assembly bay. EFFECT: high efficiency. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
ROLLING TRAIN FOR THE DEEP PINNING ON THE SLEEPERS | 1991 |
|
RU2038962C1 |
ROLLING TRAIN FOR THE DEEP PRICKING OUT OF CROSS TIES | 1991 |
|
RU2026174C1 |
TIE FEEDER OF TIE-PROCESSING LINE | 1992 |
|
RU2070245C1 |
FLOW LINE FOR DEEP PIERCING OF SLEEPERS | 0 |
|
SU1728012A1 |
EQUIPMENT FOR LAYING TIES ALONG CURVE ON RAIL-LENGTH ASSEMBLY LINE | 0 |
|
SU1789581A1 |
SLEEPERS FEEDER | 1992 |
|
RU2068470C1 |
0 |
|
SU1670024A1 | |
APPARATUS FOR SETTING RAILS ON PADS | 0 |
|
SU1361224A1 |
STAND FOR ASSEMBLY OF SWITCHES | 1991 |
|
RU2007507C1 |
SPIKE FINISH-DRIVING MACHINE | 1993 |
|
RU2063494C1 |
Authors
Dates
1996-07-10—Published
1993-04-13—Filed