FIELD: mining. SUBSTANCE: method includes dividing level into sublevels, driving sublevels with alternating strips. Sublevels are prepared by digging horizontal strips at boundaries of adjacent sublevels with solidifying backfill, driving and forming sublevel drifts over and below horizontal strip in each sublevel. Coal digging in primary strips is carried out from sublevel drifts formed above horizontal strip. The secondary strips are worked from lower drift through connections left in backfill block of the horizontal strip. Hydraulic backfill is used to fill worked space in the second chambers. EFFECT: higher productivity. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF STEEP COAL SEAMS WITH BACKING WORKED-OUT AREA | 1995 |
|
RU2083833C1 |
METHOD OF WORKING STEEP COAL BED | 0 |
|
SU1761953A1 |
METHOD FOR MINING THICK STEEPLY DIPPING SEAMS BY HYDRAULIC BREAKING WITH CAST SELF-CEMENTING FILL | 1993 |
|
RU2069752C1 |
METHOD OF MINING OF THICK STEEPLY DIPPING SEAMS BY STRINGS ON THE STRIKE | 1995 |
|
RU2101500C1 |
METHOD OF HYDRAULIC MINING OF STEEP THICK SEAMS WITH SOLID HARDENING GOBBING | 1993 |
|
RU2084631C1 |
METHOD OF HYDROMECHANICAL MINING OF STEEP COAL SEAMS | 0 |
|
SU1298381A1 |
FOR DEVELOPING STEEP DEPOSITS BY HYDRAULIC GIANT | 0 |
|
SU1737119A1 |
METHOD FOR MINING OF THICK COAL SEAMS | 1993 |
|
RU2069751C1 |
METHOD OF MININNG THICK STEEP SEAMS BY HYDRAULIC TECHNIQUE | 0 |
|
SU1314063A1 |
COAL DEPOSIT EXPLOITATION METHOD | 1992 |
|
RU2038476C1 |
Authors
Dates
1996-07-27—Published
1994-04-05—Filed