FIELD: mining industry. SUBSTANCE: development of sublevels is performed with making of filling mass by alternating strips of hardening material and hydraulic gobbing. Filling mass is arranged as stope line is advancing in strips firstly from hardening material then in strip of hydraulically filled material. At boundary of gobbing strip made by hydraulic filling, preliminarily made in coal seam is strip of hardening gobbing material. EFFECT: high efficiency. 9 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR EXPLOITATION OF STEEP COAL SEAMS WITH BACKFILL OF WORKED SPACE | 1994 |
|
RU2064580C1 |
METHOD OF UNDER-LEVEL PLASTS' DEVELOPMENT PROCESSING WITH THE BINDING OF THE ESTABLISHED SPACE | 2017 |
|
RU2644185C1 |
METHOD OF MININNG THICK STEEP SEAMS BY HYDRAULIC TECHNIQUE | 0 |
|
SU1314063A1 |
METHOD OF MINING OF THICK STEEPLY DIPPING SEAMS BY STRINGS ON THE STRIKE | 1995 |
|
RU2101500C1 |
METHOD OF MINING THICK STEEP COAL SEAMS | 0 |
|
SU1751336A1 |
METHOD FOR MINING OF THICK COAL SEAMS | 1993 |
|
RU2069751C1 |
METHOD OF RILLING THICK STEEPLY DIPPING COAL SEEMS | 0 |
|
SU1795101A1 |
METHOD FOR MINING THICK STEEPLY DIPPING SEAMS BY HYDRAULIC BREAKING WITH CAST SELF-CEMENTING FILL | 1993 |
|
RU2069752C1 |
METHOD OF HYDRAULIC MINING OF STEEP THICK SEAMS WITH SOLID HARDENING GOBBING | 1993 |
|
RU2084631C1 |
METHOD OF SUBLEVEL WORKING OF STEEP SEAMS WITH SANDSTOWING | 2011 |
|
RU2467169C1 |
Authors
Dates
1997-07-10—Published
1995-06-01—Filed