FIELD: mining. SUBSTANCE: method for installing shield support includes installing shield floor in earlier worked insert of a mine shaft with developed trench in advance position, installation of the floor onto additional props with front ends of skid resting on trench bottom. Back part with sector like support are raised to the height to provide inscribing the support into parameters of the insert provided with powered support. EFFECT: higher reliability. 5 dwg
Title | Year | Author | Number |
---|---|---|---|
SHIELD SUPPORT FOR STEEPLY DIPPING SEAMS | 1993 |
|
RU2078214C1 |
SHIELD POWERED SUPPORT FOR STEEPLY DIPPING AND SLOPING SEAMS | 1993 |
|
RU2066765C1 |
POWERED SHIELD SUPPORT FOR INCLINED AND STEEPLY DIPPING SEAMS | 0 |
|
SU1677330A1 |
METHOD OF WORKING THICK STEEP SEAMS AND MECHANIZED UNIT FOR PERFORMING SAME | 0 |
|
SU1281671A1 |
SHIELD SUPPORTING | 1992 |
|
RU2065968C1 |
METHOD FOR MOUNTING OF POWERED FACE SUPPORT ON STEEPLY DIPPING SEAMS | 0 |
|
SU1807215A1 |
MECHANIZED ROOF SUPPORT SECTION | 0 |
|
SU769005A1 |
SHIELD SUPPORT FOR THICK STEEP BEDS | 0 |
|
SU1461078A1 |
METHOD OF DISMANTLING SHIELD SUPPORTS | 0 |
|
SU1726749A1 |
POWERED UNYIELDING SUPPORT IN SETS | 1992 |
|
RU2021526C1 |
Authors
Dates
1996-07-27—Published
1994-01-17—Filed