FIELD: underground leaching. SUBSTANCE: well drilling, joining wells by hydraulic fracture, and pumping heated solutions in salt deposit. Pumped out solutions are evaporated. Exploring oil well is drilled and cased to water resistant rock laying below oil deposit, and a cavity is formed in them. Two pipes are lowered into the exploring oil well. Solution is heated by pumping cold solution in one pipe. Heated solution is pumped out through another pipe. The cavity is grouted and oil stratum is being shot after removing salts. EFFECT: high productivity. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR UNDERGROUND LEACHING OF SALTS FROM DEPOSITS | 1995 |
|
RU2081309C1 |
METHOD FOR PREVENTING FLOODING OF POTASSIUM MINES | 1997 |
|
RU2133342C1 |
METHOD OF UNDERGROUND BURIAL OF POTASSIUM PLANT EXCESSIVE BRINES | 2000 |
|
RU2188955C2 |
METHOD OF UNDERGROUND LEACHING OF CARNALLITE AND GOLD | 1999 |
|
RU2161700C2 |
METHOD FOR DEVELOPMENT OF DEPOSITS OF POTASSIUM SALTS AND GOLD | 1997 |
|
RU2117153C1 |
METHOD FOR HYDROGEOLOGICAL ZONING OF MINE FIELDS OF POTASSIUM PRODUCING ENTERPRISES | 2003 |
|
RU2261330C2 |
METHOD FOR COMBINE DEVELOPMENT OF ROCK SALT AND IODINE WATER DEPOSITS | 1996 |
|
RU2106489C1 |
METHOD OF CONTROL OVER STRESSED STATE OF SEISMIC REGION | 1998 |
|
RU2150721C1 |
PROCESS OF WINNING GOLD AT POTASSIUM FIELD | 1999 |
|
RU2170352C1 |
0 |
|
SU140369A1 |
Authors
Dates
1996-08-10—Published
1992-02-24—Filed