FIELD: mining industry. SUBSTANCE: according to method, bore-hole is drilled from surface to upper contact of water-passing passage between water-bearing horizon and underground workings. After determining connection between brine appearance in underground working and abovebrine water in area of disturbed water-protective depth, two bore-holes are drilled from surface and are cased them with pipes. Filters are installed in these bore-holes. Filters are positioned at level of brine horizon. Distance between bore-holes is determined by parameters of zone of disturbance of water protective depth located between them. It varies within range of 10-100 m. Determined is level of brine in bore-holes. Plugging slurry is injected into one of wells which is located upstream of flow. Brine is pumped out from other bore-hole. Injection of plugging solution and pumping-out of brine are started simultaneously and carried out continuously each at constant flow rate. Pumping-out flow rate exceeds injection flow rate by 2-4 times. This allows for reaching hydrodynamic equalization of bed volume being treated. Application of aforesaid method enhances reliability in prevention of flooding. EFFECT: higher efficiency. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR UNDERGROUND MINING POTASSIUM SALTS DEPOSITS AFFECTED BY BREACHINGS OR FLOODINGS | 2015 |
|
RU2608140C2 |
MONITORING METHOD FOR ANOMALOUS ZONES OF WATERPROOF LAYER IN POTASSIUM MINE | 2004 |
|
RU2257472C1 |
METHOD FOR DEVELOPING KIMBERLITE DEPOSITS | 2017 |
|
RU2664281C1 |
METHOD FOR HYDROGEOLOGICAL ZONING OF MINE FIELDS OF POTASSIUM PRODUCING ENTERPRISES | 2003 |
|
RU2261330C2 |
METHOD OF PREVENTION OF FLOODING OF POTASSIUM MINES AND HAZARDOUS DEFORMATIONS OF EARTH SURFACE AT UNDERGROUND WATER INRUSH INTO MINES | 2007 |
|
RU2341658C1 |
METHOD OF UNDERGROUND BURIAL OF POTASSIUM PLANT EXCESSIVE BRINES | 2000 |
|
RU2188955C2 |
METHOD FOR UTILIZATION OF INDUSTRIAL EFFECTS OF AN ENTERPRISE IN THE CONDITIONS OF CRYOLITHOZONE | 2022 |
|
RU2790345C1 |
PROCEDURE TO FORESTALL EMERGENCY SITUATION IN POTASSIUM MINES BY GEOPHYSICAL METHODS | 2000 |
|
RU2175140C1 |
METHOD OF PREDICTING EARTHQUAKE TIME IN POTASH SALT MINES | 1998 |
|
RU2153584C2 |
METHOD FOR BACKGROUND ENVIRONMENTAL PARAMETER DETERMINATION TO PREVENT APPEARANCE OF EMERGENCY CONDITIONS IN POTASH MINES | 2004 |
|
RU2265125C2 |
Authors
Dates
1999-07-20—Published
1997-08-13—Filed