FIELD: blasting operations. SUBSTANCE: process relates to blasting of steel structures. Explosive devices are installed along welds of armored vehicle or tank. They are initiated in sequence in direction from nose to stern part of hull. If explosive devices are installed inside and outside of hull initiation of explosive device positioned inside hull is delayed by 0.0001-0.0002 s. Gear for implementation of process includes cord charges 2 and 3 placed inside and outside of hull 1, delay line 4, initiator 5 with explosive net 6. Trinitrotoluene equivalent of charge mass is found by relation given in description of invention. EFFECT: enhanced blasting efficiency. 3 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DESTRUCTION OF ARMORED EQUIPMENT | 1999 |
|
RU2173832C2 |
METHOD FOR DESTRUCTION OF ARMORED EQUIPMENT | 1999 |
|
RU2154802C1 |
METHOD FOR DESTRUCTION OF ARMORED EQUIPMENT | 1999 |
|
RU2153149C1 |
METHOD OF REPROCESSING OF METAL-REINFORCED RUBBER ARTICLES | 1996 |
|
RU2140356C1 |
PROCESS OF BLASTING CROPPING OF WEAPONS AND MILITARY EQUIPMENT FOR SCRAP | 1994 |
|
RU2094753C1 |
METHOD OF DIVIDING THE COMPLEX METAL CONSTRUCTIONS INTO THE SCRAP METAL | 1992 |
|
RU2041773C1 |
RESOURCE-SAVING METHOD FOR REMOVAL OF MINE-TYPE STRUCTURES | 2016 |
|
RU2638047C1 |
METHOD OF DISASSEMBLING METAL STRUCTURES BY EXPLOSION | 1992 |
|
RU2010649C1 |
METHOD FOR SEPARATION OF COMPOSITE STRONGLY JOINED MONOLITHIC MATERIALS WITH CONTINUOUS INTERFACE | 1994 |
|
RU2093351C1 |
QUASAR-METHOD OF DISMANTLING OF METALWORKS (VARIANTS) | 1995 |
|
RU2084818C1 |
Authors
Dates
1996-08-20—Published
1992-06-03—Filed