FIELD: oil production with use of heat, mainly, from reservoirs with heavy, high-viscosity or bitumen oil in combination with drilling the horizontal wells. SUBSTANCE: installed into drilled well with horizontal bore is casing string, casing string-to-borehole annulus is cemented above the horizontal bore. Casing string is perforated by circular generating lines in end part and at the beginning of horizontal part, just before cementing plug. Tubing is run and centered in casing string by means of packer which is installed behind the first group of perforations. Heat carrier is supplied through tubing, and the product is withdrawn through the second group of perforations, and transported through tubing-to-casing annulus. EFFECT: reduced energy consumption and higher operate reliability due to local optimization of the process. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FOR REPLACEMENT OF OIL FROM HORIZONTAL WELL | 2010 |
|
RU2421608C1 |
METHOD OF INCREASING OIL RECOVERY FROM FORMATION | 2001 |
|
RU2191895C1 |
METHOD FOR EXTRACTING A DEPOSIT OF HIGHLY VISCOUS OIL | 2005 |
|
RU2287676C1 |
METHOD FOR HIGHLY-VISCOUS OIL PRODUCTION FROM HORIZONTAL WELL UNDER RESERVOIR TREATMENT WITH HEAT | 2005 |
|
RU2301328C1 |
METHOD FOR EXTRACTING RESERVOIRS OF HIGHLY VISCOUS OIL OR BITUMEN | 2005 |
|
RU2289685C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL DEPOSIT | 2015 |
|
RU2599118C1 |
DEVELOPMENT METHOD OF HIGH-VISCOSITY OIL DEPOSIT AND BITUMENS, AND DEVICE FOR HEAT DISPLACEMENT OF PRODUCT FROM HORIZONTAL WELLS | 2010 |
|
RU2445452C1 |
METHOD OF HIGH-VISCOCITY OIL PRODUCTION | 2002 |
|
RU2206728C1 |
METHOD FOR HIGH-VISCOUS OIL OR BITUMEN FIELD DEVELOPMENT | 2005 |
|
RU2274742C1 |
METHOD OF DEVELOPING HIGH-VISCOSITY OIL FIELD | 2015 |
|
RU2584467C1 |
Authors
Dates
1996-09-27—Published
1994-01-05—Filed