FIELD: oil production, particularly to produce heavy oil from reservoirs with the use of heat.
SUBSTANCE: method involves drilling continuous well extending to day surface; installing casing pipe in the well and cementing hole clearance; perforating casing pipe in several intervals and installing tubing string provided with packers at tubing string ends in the casing pipe; arranging packers in front of perforation intervals and performing packer setting in well; supplying heat carrier in flow string from the first well end; producing well product from inlet well end via flow string to provide necessary intake capacity; serially installing packers within perforation intervals from extreme perforation intervals to central one in non-perforated zones; setting packer in well. Heat carrier is fed in reservoir from inlet and outlet well ends via flow strings downstream of the packers. Product is extracted via tube space upstream of the packers up to bottomhole formation zone drainage initiation. Then the well is used as injection or production well.
EFFECT: increased efficiency due to serial interval treatment with heat, extended coverage of heat application and provision of oil displacement from bottomhole formation zone.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
HIGH-VISCOSITY OIL PRODUCTION METHOD | 2006 |
|
RU2307242C1 |
METHOD FOR HIGHLY-VISCOUS OIL PRODUCTION | 2005 |
|
RU2296856C1 |
METHOD OF HIGH-VISCOCITY OIL PRODUCTION | 2002 |
|
RU2206728C1 |
METHOD OF INCREASING OIL RECOVERY FROM FORMATION | 2001 |
|
RU2191895C1 |
METHOD FOR DEVELOPMENT OF RESERVOIR OF HIGH-VISCOUS OIL | 2009 |
|
RU2405929C1 |
METHOD FOR EXTRACTING RESERVOIRS OF HIGHLY VISCOUS OIL OR BITUMEN | 2005 |
|
RU2289684C1 |
METHOD FOR EXTRACTING RESERVOIRS OF HIGHLY VISCOUS OIL OR BITUMEN | 2005 |
|
RU2289685C1 |
DEVELOPMENT METHOD OF HIGH-VISCOSITY OIL DEPOSIT AND BITUMENS, AND DEVICE FOR HEAT DISPLACEMENT OF PRODUCT FROM HORIZONTAL WELLS | 2010 |
|
RU2445452C1 |
METHOD FOR EXTRACTING A DEPOSIT OF HIGHLY VISCOUS OIL | 2005 |
|
RU2287676C1 |
METHOD FOR CONSTRUCTION AND OPERATION OF VERTICAL WELL FOR STEAM ASSISTED GRAVITY DRAINAGE OF HIGH-VISCOSITY OIL OR BITUMEN | 2012 |
|
RU2516077C1 |
Authors
Dates
2007-06-20—Published
2005-11-30—Filed