FIELD: soil reclamation. SUBSTANCE: method for running drain header includes cutting pioneer trench and concurrent loosening of bottom soil. Then a cable is laid down the trench and pipes are drawn through with concurrent washing soil out in front of the pipe. Compacting soil may be carried out concurrently with loosening at section being adjacent. EFFECT: higher efficiency. 2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF LAYING PIPE LINE | 2001 |
|
RU2200800C2 |
DRAINAGE BUILDING METHOD | 2002 |
|
RU2247192C2 |
METHOD AND DEVICE FOR PLASTIC DRAINAGE SYSTEM ERECTION | 2004 |
|
RU2260091C1 |
NARROW-TRENCH METHOD OF HORIZONTAL DRAIN CONSTRUCTION AND DEVICE FOR ITS REALISATION | 2009 |
|
RU2422586C1 |
DEVICE FOR LAYING UNDERGROUND SERVICE LINES IN WATER- LOGGED GROUNDS | 2001 |
|
RU2209889C1 |
METHOD OF LAYING PIPELINE ACROSS A WATER OBSTACLE | 0 |
|
SU1555585A1 |
DRAINAGE CONSTRUCTION METHOD ON BUSHY WATERLOGGED LANDS | 2022 |
|
RU2782322C1 |
METHOD AND DEVICE FOR DRAINAGE BUILDING IN WATER-SATURATED SOIL | 2004 |
|
RU2274707C1 |
METHOD OF BUILDING PLASTIC DRAINAGE IN WATER-LOGGED GROUND | 2003 |
|
RU2232844C1 |
METHOD FOR CONSTRUCTION OF CANAL IN A DEPRESSION | 0 |
|
SU1677162A1 |
Authors
Dates
1996-10-20—Published
1991-03-12—Filed