FIELD: mining and construction; applicable in drilling and blasting operations in reclamation of slopes. SUBSTANCE: in reclamation of slope, drilled from working platform of overlying bench at calculated distance from slope through its mass are line holes on underlying bench located under bench with slope to be formed, and they are fired first, by their length from bottom and for remaining length, they are fired with holes of overlying bench, and, then, new perms are formed. Mathematic formulas for determination of distance of hole mouth from slope and length from bottom of its initial firing. EFFECT: higher efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR OPEN-PIT RECONSTRUCTION | 1993 |
|
RU2046189C1 |
METHOD OF OPEN-PIT MINING | 1996 |
|
RU2098627C1 |
METHOD OF MINERAL EXTRACTION FROM FLANKS OF OPENCAST | 1995 |
|
RU2087716C1 |
QUARRY DEVELOPMENT METHOD | 1996 |
|
RU2118456C1 |
METHOD OF SLOPING HIGH BENCHES ON OPENCAST LIMITING CONTOUR | 2000 |
|
RU2178079C1 |
METHOD FOR SLANTING OF HIGH BENCHES ON OUTLINE OF OPEN PIT | 2003 |
|
RU2255304C2 |
PROCESS OF ARRANGEMENT OF HIGH WALLS IN OUTLINE OF STRIPPING | 2002 |
|
RU2224110C1 |
METHOD OF MINERALS QUARRY MINING | 2008 |
|
RU2378512C1 |
METHOD FOR DEVELOPMENT OF ROCKS IN OPEN PIT RECONSTRUCTION | 2009 |
|
RU2395688C1 |
METHOD FOR PROTECTION OF SAFETY BENCH IN OPEN PIT | 1991 |
|
RU2023159C1 |
Authors
Dates
1996-10-20—Published
1991-01-03—Filed