FIELD: mining. SUBSTANCE: collector workings are driven and horizontal workings are driven from those along the axis of chambers. Collector workings are driven below primary chambers by a space not less than ore body thickness. Excavation is performed by chambers of the first and second stage. Horizontal workings are driven in the chambers of the first stage. Width of the workings is determined by a formula. Support rock members are formed in rock massif of the first stage chambers. The second chambers are worked. Besides, support members are pressed out by pressurized viscous liquid. EFFECT: safety of works. 3 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CONTROL OF ROCK PRESSURE (DEFORMATIONS) IN ROCK MASS ON SOLID MINERAL DEPOSITS | 1995 |
|
RU2087713C1 |
METHOD FOR ROCK SUPPORTING | 0 |
|
SU1665037A1 |
METHOD OF BURIAL OF HARMFUL WASTES IN FILL OF WORKED-OUT SPACE OF U UNDERGROUND MINE WORKINGS | 1992 |
|
RU2089732C1 |
METHOD FOR FILLING UNDERGROUND WORKINGS WITH SELF-CEMENTING METALLURGICAL WASTES AND DEVICE FOR ITS REALIZATION | 1992 |
|
RU2044892C1 |
METHOD FOR SAVING RESOURCES IN BACKFILLING THE WORKED OUT SPACE | 1993 |
|
RU2077677C1 |
METHOD OF WORKING UNSTABLE ORE BODIES | 0 |
|
SU905466A1 |
METHOD OF BLASTING OF LOW-STABLE ORE BODIES | 1992 |
|
RU2089844C1 |
METHOD OF CONTROLLING ROCK PRESSURE | 0 |
|
SU1397607A1 |
METHOD OF PREPARING BOTTOM OF BLOCK | 2005 |
|
RU2348808C2 |
METHOD OF LAYER MINING OF KIMBERLITE PIPE BY RAISING AND FILLING | 2001 |
|
RU2186981C1 |
Authors
Dates
1996-11-10—Published
1989-02-27—Filed