NATURAL PRESSURE GAS LIFT UNIT WITH PLUNGER LIFT Russian patent published in 1996 - IPC

Abstract RU 2070278 C1

FIELD: oil production, particular, methods for oil well operation with periodic supply of working agent to drill string-borehole annulus. SUBSTANCE: natural pressure gas lift unit with plunger lift has tubing string, wellhead and bottom hole shock absorbers, valve under bottom-hole shock absorber, shank lowered to well perforation interval, plunger, mechanism for retaining the plunger on the buffer, controlled shutoff devices of the flow and injection lines of the well. Chamber with receiving valve is provided between the bottom hole shock absorber and shank. Receiving valve is located in passage channel between shank and chamber. Check valve with calibrated passage hole is installed on the chamber side wall and communicates the drill string-borehole annulus with chamber and passage channel of bottom hole shock absorber. EFFECT: maximum utilization of energy of natural gas of gas bearing formations and gas caps of oil deposits including associated petroleum gas from formation, reduced specific consumption of gas for oil lift, reduced backpressure of formation water on the bottom hole to oil inflow from formation and, increased well production rate. 3 dwg

Similar patents RU2070278C1

Title Year Author Number
METHOD FOR OPERATION OF A GROUP OF OIL PRODUCING WELLS AND PLANT FOR ITS EMBODIMENT 1995
  • Shajkhulov Zh.S.
  • Ageev V.G.
  • Pjatkin N.N.
RU2070277C1
METHOD OF OIL RECOVERY 1995
  • Duplikhin V.G.
RU2078910C1
DEEP WELL ROD PUMPING UNIT 1996
  • Shajkhulov Zh.S.
  • Duplikhin V.G.
RU2101471C1
METHOD OF LIFTING WELL FLUID AND COMBINED WELL LIFT FOR REALIZATION OF THIS METHOD 1999
  • Vasiljadi V.P.
  • Shchukin A.I.
  • Vasiljadi P.V.
  • Sergeeva L.V.
RU2160853C1
FACE DEVICE FOR GAS-LIFT OPERATION OF WELLS 2003
  • Dijashev R.N.
  • Tsyrenov S.D.
  • Pisakhovich V.F.
  • Shagapov G.Sh.
  • Mazitov K.G.
  • Nuriakhmetov L.G.
RU2252310C2
DEVICE FOR WELL DEPRESSION CLEANUP 1995
  • Shajkhulov Zh.S.
  • Aminev M.Kh.
RU2099506C1
EQUIPMENT FOR DUAL BED OPERATION FOR OIL- AND GAS-BEARING FORMATIONS IN WELL 2014
  • Danilenko Aleksandr Nikolaevich
  • Sidorov Dmitrij Anatol'Evich
  • Platov Jurij Ottovich
RU2572041C2
METHOD FOR GAS-LIFTING OPERATION OF WELL - CONTINUOUS-DISCONTINUOUS GAS-LIFT AND DEVICE FOR REALIZATION OF SAID METHOD 2003
  • Sharapinskij V.K.
RU2239696C1
INTERMITTENT GAS-LIFT INSTALLATION 0
  • Aliev Elchu Misir Ogly
  • Poladov Alisakhib Rza Ogly
  • Agalarov Fazil Farrukh Ogly
SU985261A1
METHOD OF TREATMENT OF BOTTOMHOLE ZONE OF THE WELL 2019
  • Shilov Sergei Nikolaevich
RU2708647C1

RU 2 070 278 C1

Authors

Shajkhulov Zh.S.

Duplikhin V.G.

Ageev V.G.

Pjatkin N.N.

Dates

1996-12-10Published

1995-07-27Filed