FIELD: oil and gas industry.
SUBSTANCE: equipment includes an external flow string with openings and return valve with inner coaxial flow string placed in the above string and connected to a detachable device complete with heating cable fixed at the string outer surface and device for sealed isolation of the formations, which is made as a packer with system cutting off the oil formation. The electric submersible unit is placed in the overpacker zone, in the casing. Lower part of the casing is connected to the shank equipped with the return valve while the shank is connected to the packer by the detachable device. Upper part of the casing is coupled to a cable gland unit, which, in its turn, is connected to the external flow string, to the electric submerged unit and detachable device intended for connection to the inner flow string, at that the above cable gland unit is made with hermetic cable seal of the electric submerged unit.
EFFECT: maintaining collecting properties of the oil formation at replacement of downhole pump equipment, improved efficiency of the equipment.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
BOREHOLE PUMP UNIT FOR SIMULTANEOUS OPERATION OF TWO BEDS WITH GAS BYPASS FROM UNDER PARKER SPACE (VERSIONS) | 2011 |
|
RU2464413C1 |
WELL PUMPING UNIT FOR SIMULTANEOUS SEPARATE DEVELOPMENT OF TWO RESERVOIRS IN WELL | 2010 |
|
RU2427705C1 |
METHOD OF DUAL OIL PRODUCTION FROM LAYERS OF ONE WELL WITH SUBMERSIBLE PUMP SET (VERSIONS) | 2007 |
|
RU2344274C1 |
FORMATION CUT-OFF PROCEDURE FOR WORK OVER WITHOUT WELL KILL OPERATION | 2013 |
|
RU2531011C1 |
METHOD FOR COMPLEX PRODUCTION OF HYDROCARBONS FROM OIL AND GAS CONDENSATE WELLS AND A SYSTEM FOR ITS IMPLEMENTATION | 2020 |
|
RU2756650C1 |
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTIPLE-ZONE WELL BY TWO SUBMERSIBLE PUMPS AND EQUIPMENT FOR ITS IMPLEMENTATION | 2012 |
|
RU2515630C1 |
METHOD FOR UNDERGROUND WELL REPAIR FOR REPLACEMENT OF DOWNHOLE PUMPING EQUIPMENT WITHOUT ACTION ON FORMATION | 2015 |
|
RU2592903C1 |
DEVELOPMENT METHOD OF OIL WELLS (VERSIONS), AND PLANT FOR ITS IMPLEMENTATION (VERSIONS) | 2010 |
|
RU2471065C2 |
PRODUCING RESERVOIRS SURVEY METHOD AT DUAL OPERATION OF MULTI-PAY WELL AND INSTALLATION FOR ITS IMPLEMENTATION | 2014 |
|
RU2546218C1 |
PUMP UNIT FOR SIMULTANEOUS SEPARATE OPERATION OF TWO FORMATIONS IN WELL | 2011 |
|
RU2469181C1 |
Authors
Dates
2015-12-27—Published
2014-04-15—Filed