FIELD: railway repairing. SUBSTANCE: device has gantry crane installed on crawler truck and rail truck to move it, hand trucks being moved along railway track, and hoists for lifting track members having traveling gears to travel along the railway track. Method for replacing the members of the railway track lies in the fact that outdated members of the track are removed by the gantry crane, stacked onto the hand trucks, moved on the tracks to the area of dismantling outdated members of the track. New members of the track are moved by the hand trucks to the area of laying down using the gantry crane. The new members of the crane are laid down by the gantry crane. As this takes place, the movement of the track members between hand trucks and dismantling area for outdated track members, or laying down area for new track members is carried out using hoists for lifting track members. The gantry crane is used as prime mover for moving hand trucks. EFFECT: higher efficiency. 9 cl, 11 dwg
Title | Year | Author | Number |
---|---|---|---|
MACHINE FOR REPLACING ELEMENTS OF RAILWAY TRACK | 0 |
|
SU969171A3 |
MACHINE FOR CONTINUOUS REPLACEMENT OF RAILWAY TRACK | 0 |
|
SU1012801A3 |
FLOW LINE FOR ASSEMBLY OF POINT SWITCHES OF RAILWAY TRACK | 2008 |
|
RU2373319C1 |
FLOW LINE FOR ASSEMBLY OF RAIL TRACK SWITCH | 2010 |
|
RU2451125C1 |
RAILWAY SLIP SWITCH ASSEMBLY BELT LINE | 2009 |
|
RU2400590C1 |
MOBILE INSTALLATION FOR REMOVING, STACKING AND CONVEYING TRACK LATTICES | 0 |
|
SU1537145A3 |
MACHINE FOR REPLACING SLEEPERS OF RAILWAY TRACK | 0 |
|
SU1547715A3 |
METHOD OF AND DEVICE FOR REPLACEMENT OF SWITCHES | 2000 |
|
RU2194112C2 |
MOVABLE MACHINE FOR STRAIGHTENING RAILWAY TRACK IN PLANE AND PROFILE OF SWITCHES | 0 |
|
SU1660585A3 |
SWITCH REPLACEMENT DEVICE | 2002 |
|
RU2230847C2 |
Authors
Dates
1997-01-20—Published
1992-08-25—Filed