FIELD: transport.
SUBSTANCE: proposed belt line comprises conveyor of bars, device to furnished bars with fasteners, device to direct bars on accumulating conveyor, assembly line with carriage embracing it to move in guides and provided with fasteners of its metal parts, slip switch with bars and carriage to removed assembled slip switches. Accumulating conveyor can consecutively move through epure pitch to make a set of slip switch bars. Said conveyor is equipped with shuttle transfer unit to move assembled slip switch sets onto assembly line. Said shuttle transfer unit represents two platforms reciprocating onto vertically moving roll table.
EFFECT: higher efficiency.
3 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
FLOW LINE FOR ASSEMBLY OF POINT SWITCHES OF RAILWAY TRACK | 2008 |
|
RU2373319C1 |
FLOW LINE FOR ASSEMBLY OF RAIL TRACK SWITCH | 2010 |
|
RU2451125C1 |
FLOW LINE FOR ASSEMBLY OF RAIL TRACK SWITCH | 2010 |
|
RU2451124C1 |
AUTOMATED COMPLEX FOR ASSEMBLING RAIL-SLEEPER GRID OF RAILWAY TRACK | 2021 |
|
RU2761484C1 |
PRODUCTION ASSEMBLY LINE OF TRACK SWITCHES | 2008 |
|
RU2385373C1 |
METHOD FOR FLOW ASSEMBLY OF POINT SWITCHES | 2008 |
|
RU2374377C2 |
PRODUCTION ASSEMBLY LINE OF LINKS OF TRACK SKELETON OF RAILROAD | 2010 |
|
RU2436886C1 |
METHOD TO ASSEMBLE SWITCH THROWS | 2009 |
|
RU2424392C1 |
FLOW LINE FOR ASSEMBLY OF RAIL-AND-SLEEPER GRID LINKS IN RAILWAY TRACK | 2008 |
|
RU2373320C1 |
METHOD TO ASSEMBLE POINT SWITCHES | 2008 |
|
RU2382134C1 |
Authors
Dates
2010-09-27—Published
2009-07-10—Filed